"Over the past 18 years I have had the pleasure of working with Garden Spot Electric on numerous municipal projects. Garden Spot Electric's quality workmanship, attention to detail, fair and positive negotiations represent the qualities that our Owners desire."

Matthew D. Todaro, P.E.
Buchart-Horn, Inc.

Project Gallery

We pride ourselves in our large list of satisfied clients. Below are a few examples of how we've helped some of our past clients.

Conestoga Wood Addition

This was a Design-Build project. Garden Spot Electric provided the Engineering and Construction for Conestoga Wood. Included in the project was an 80,000 sq. ft. warehouse / assembly area, an office area with a fiber optic link to the main facility, a 160 KW emergency generator, and a 1500 KVA transformer fed from the owners 12,470 volt distribution.

Conestoga Wood Addition Conestoga Wood Addition Conestoga Wood Addition Conestoga Wood Addition Conestoga Wood Addition Conestoga Wood Addition Conestoga Wood Addition

The Millersville University - Conversion of their Boiler house to a computer facility

This was a plan & spec project. The facility had existing thic stone walls through which we had to run feeder and branch conduits. The interior of the facility had to be converted from an industrial building into a modern commercial space. We installed a complete new electrical system including lighting, emergency system with generator, power outlets, & floor boxes.

Millersville University Boiler Room Conversion Millersville University Boiler Room Conversion Millersville University Boiler Room Conversion

Octorara Water Treatment Plant expansion and Synchronous motor

These projects included a 1,250 HP Synchronous motor with high voltage Switchgear and PLC control system, 35kv 4160v step-down transformer with substation modifications.

Octorara Water Treatment Plant Octorara Water Treatment Plant Octorara Water Treatment Plant Octorara Water Treatment Plant Octorara Water Treatment Plant Octorara Water Treatment Plant Octorara Water Treatment Plant Octorara Water Treatment Plant Octorara Water Treatment Plant Octorara Water Treatment Plant Octorara Water Treatment Plant Octorara Water Treatment Plant

Lancaster Cold Storage Facility

This was a 126,000 sq. ft. cold storage warehouse with some areas to be operated at temperatures of less than 20 degrees Fahrenheit. Special sealing of wiring was required between warehouse areas with different temperatures to prevent airflow between warehouse sections.

Lancaster Cold  Storage Facility Lancaster Cold  Storage Facility Lancaster Cold  Storage Facility Lancaster Cold  Storage Facility

Turnpike Exchange

When the Turnpike Commission upgraded one of its interchanges and toll collection building, the traffic flow could not be interrupted. Garden Spot Electric provided all of the electrical work for this multi-phased toll collection project including Traffic Lighting, Emergency Generator, and new offices.

Pennsylvania Turnpike Exchange Electrical Construction Pennsylvania Turnpike Exchange Electrical Construction Pennsylvania Turnpike Exchange Electrical Construction Pennsylvania Turnpike Exchange Electrical Construction

Ephrata WWTP

Garden Spot Electric provided all of the electrical work for the new Ephrata WWTP as shown in this aerial view. The project included the intake structure on the far right on the other side of the road, the administrative building in the upper left and all of the process facilities in between.

  • These included a 900 KW generator
  • Wiring of the Kruger Process Control System
  • A new 2000 amp 480 volt service
  • 6 motor control centers
  • Explosion proof wiring in hazardous areas of the plant
  • Interior & Site lighting
  • Wiring of all process equipment
Ephrata WWTP High Voltage Electrical installation

Dover WWTP

Some of the special features & requirements of this project were:

  • PVC coated heavy wall conduit
  • Keep the plant in operation throughout the 2 year project duration
Dover WWTP High Voltage Electrical installation Dover WWTP High Voltage Electrical installation Dover WWTP High Voltage Electrical installation Dover WWTP High Voltage Electrical installation Dover WWTP High Voltage Electrical Installation

Lancaster Airport

When the FAA revised their airport signage lighting requirements, we stepped in to update the signs and lights at the Lancaster and Reading airports. We have been doing airport projects since the 1970's

Lancaster Airport High Voltage Electrical installation Lancaster Airport High Voltage Electrical installation Lancaster Airport High Voltage Electrical installation Lancaster Airport High Voltage Electrical installation

Lancaster Columbia water plant substation upgrade

This project involves the total upgrade of the two main water treatment facilities as well as the pump station that feeds out of the Susquehanna River. Some of the special features of this project are:

  • 69KV Substation work
  • Installation of a 69kv to 4160v transformer and 4160v distribution
  • New membrane treatment facilities with automated PLC controls
  • 800 HP 4160 Volt VFDs as well as 400 HP 480 volt VFDs
  • Complete security upgrade to protect the water supply process